S
Sam
New member
- Joined
- Aug 6, 2025
- Messages
- 4
- Points
- 3
It’s one of the most common non-conformances in BRCGS or SALSA audits—confusing Validation (will it work?) with Verification (did it work?). While we all have our daily check sheets, the initial validation of a CCP—like a cook temperature or a metal detector sensitivity—is where the real scientific 'proof' is needed.
I’m curious to hear from the technical minds here:
I’m curious to hear from the technical minds here:
- What’s your 'gold standard' for validating a new piece of kit? Do you rely on manufacturer data, or do you run exhaustive in-house challenge tests?
- How often are you re-validating your processes? Is an annual review enough, or do you trigger a fresh look every time a raw material spec changes?